With no pressing maintenance I am falling back to cleaning up the injection gear I have, finding some issues. Have new injectors, so pulled the manifold down, cleaned up the fuel rail, oiled the injector Orings, tried to reassemble. Very , very difficult. The bolt down arms for the fuel rail dont go anywhere near lining up on the bolt holes on the manifold, at least starting with the injectors in the manifold. In the end I dismantled the second intake set, for its fuel rail. With no injectors in place the fuel rail arms sat nicely over the bolt holes. Put the injectors in the manifold, problem again. Pulled the injectors, fitted and clipped them onto the rail first - better, but still a struggle to get the holes to line up. Managed to get the bolts in, but it wasnt fun. Am I missing something here?
Managed to get an SD1 sump, for the brace to the bellhousing, which I think is functional, given the extra weight of the iron case in an LT77.